#BustTheMyth
Nuclear Power – No Solution to ClimateChange!
#BustTheMyth Tweets
on this blog –
whats up: #BustTheMyth :: nukes are NOT carbon-free, clean, safe, green, or affordable!
rc's nuclear blog • NO NUKES! | #RE_TOOL NOW
see also
The #OcNuke Daily
what it is photo blog | whats more art & studies | what next news & random blog
Nuclear-Free, Carbon-Free at the People's Climate March September 21, 2014 |
(Facebook event page) International Uranium Film Festival Berlin 2016
International Uranium Film Festival | THE ATOMIC AGE FILM FESTIVAL
more: Diablo Shutdown Marks End of Atomic Era
--- Shut it down NOW!
they say that they will shut Diablo Canyon, but not for another 9 years. that is 9 years too long, 9 more years of unacceptable risk.
"... Is this a clever move by PG&E announcing the closure of Diablo in 2024 & 2025 to prevent the Lands Commission from insisting on prohibiting once through cooling? which if they were legally and rightfully ruled against would mean the closure of Diablo by 2018 ... any WE WON'T BE FOOLED! This June 28th California State Lands Commission meeting is still very important and may be a chance to get the Devil shut down earlier. Nine years is a very long time! That's why the meeting of the Lands Commission is crucial it's a meeting happening simultaneously in 2 locations LIVE MTG in Sacramento at 10am JUN 28 ... SIMULCAST mtg in MORRO BAY COMMUNITY CTR @10 preceded by a RALLY at 9am. https://www.facebook.com/events/2191521814320908/
– thanks to Laura Lynch!!Shut Diablo Nuke Plant MAJOR Eventhttps://www.facebook.com/events/235130220206969/
more: Fukushima Scandal; What IS A Meltdown? | SimplyInfo
NOTE: On June 22, 3 days after this post: History made: The deal to shut down the Diablo Nuclear Power Plant — Medium ––––
Good news, but: Shut it NOW!
9 more years is 9 more years of unacceptable risk!
see also (NEW) – whats up: Diablo Shutdown Marks End of Atomic Era | Shut it down NOW!
ACTION ALERT! ... please email the California Lands Commission prior to the meeting whether you are attending or not! ... I hope everyone who reads this, will copy it and "paste" into an 'e-mail, sign it, and immediately send it to the State Lands Commission
EMAIL: CSLC.CommissionMeetings@slc.ca.gov.
On June 28th of this month, The California State Lands Commission will decide whether or not to require a full California Environmental Quality Act (CEQA) review and Environmental Impact Report (EIR) before considering the renewal of State tidelands at the Diablo Canyon nuclear facility, owned and operated by PG&E. The leases on the tidelands are due to expire in 2018 and 2019.
Under current State law, the Lands Commission must perform an EIR to determine the health of the tidal wetlands under its jurisdiction. The Diablo Canyon reactors pull 2.5 billion gallons of seawater every day. This system, called once-through cooling, does significant damage to marine ecosystems. Biologists have estimated that Diablo Canyon sucks in more than 1.5 billion fish larvae a year, and none survive.
The State of California has already ruled that all coastal power plants must reduce seawater intake by over 90%. The risk of earthquake has also become clear since the Fukushima disaster, and PG&E has failed to report, after more than 5 years, if this nuclear facility can withstand the new .75 G standard.
Thank you!
more: EDITORIAL: Extent of TEPCO cover-up over meltdown must be clarified:The Asahi Shimbun
more: EPA PROPOSES SHOCKING THOUSAND-FOLD INCREASE IN RADIOACTIVITY ALLOWED IN DRINKING WATER via Nuclear Information and Resource Service (NIRS)
SIGN NOW: EPA: Don't Allow Radiation in Drinking Water! - Food & Water Watch
READ: Nuclear Industry Worldwide Faces Escalating Battle to Keep Aging Reactors Running
Sign (NY) – Tell NRC: Keep Indian Point Shut Down!
Einstein said,
"The splitting
of the atom
changed everything
save man's mode
of thinking;
thus we drift towards
unparalleled catastrophe."
He also said,
"Nuclear power is a hell of a way
to boil water!"