Monday, September 19, 2022

Opinion | Nuclear Power Still Doesn’t Make Much Sense - The New York Times


Opinion | Nuclear Power Still Doesn’t Make Much Sense - The New York Times

Thursday, September 8, 2022

The Insanity of Expanding Nuclear Energy - Emagazine.com

Former nuclear regulatory top dogs from the United States, France, Germany and Great Britain issued a joint statement in January strenuously opposing any expansion of nuclear power as a strategy to combat climate change. Why? There is not a single good reason to build new nuclear plants. Here are ten solid reasons not to…

Wednesday, January 10, 2018

Global Nuclear Power in 2017 : Bankruptcies, Shutdowns, Abandoned Constructions Show A Deepening Crisis | DiaNuke.org




The Year 2017 for Global Nuclear Power in a nutshell: 4 reactor startups (12 less than scheduled), 3 shutdowns, 4 construction starts, 2 abandoned constructions, bankruptcy of Westinghouse, bailout and breakup of AREVA, significant financial and economic pressure on nuclear operators. Five new reactors entered long-term outage, and 3 were restarted. Globally, 405 reactors operating (1 less than a year ago), 52 under construction (3 less).

read: Global Nuclear Power in 2017 : Bankruptcies, Shutdowns, Abandoned Constructions Show A Deepening Crisis | DiaNuke.org


Thursday, December 21, 2017

The Night The Lights Went Out In Georgia | Fairewinds Energy Education

70 South Winooski #289, Burlington, VT 05401
Phone 802-865-9933
Written by Arnie Gundersen, Grayson Webb & Ben Shulman-Reed 
Edited by Maggie Gundersen

Not sure what to do with all the enormous amounts of money you are going to get from the tax cuts? Donate it to Fairewinds! 


Our work is not possible without your support. 
Thank you and Happy Holidays!
Capsized at the Pier: Vogtle and the Vasa
Written by Arnie Gundersen
Today, almost on Christmas-weekend, Santa came early to Georgia Power (GP) with a multi-billion-dollar present, when the Georgia Public Service Commission (GPSC) gave GP’s Vogtle Atomic Power Project approval to continue construction! The GPSC granted the go-ahead to the behind-schedule over-budget two-unit Westinghouse Vogtle Nuclear Power Plant
against the advice of its own staff of experts to continue its construction for another half a decade. Great for Georgia Power, when real people are stuck paying the bills!
Why aren’t we at Fairewinds Energy Education surprised that Georgia Power will continue its Vogtle boondoggle for another half a decade? GPSC’s 5-Commissioners (supposed utility and energy company regulators), are elected to their cushy $116,452 per year salaries (2014 salaries on record) and run for office with 85% of their campaign funds as “donations” from Georgia’s energy companies, according to an exposé by the Atlanta Journal-Constitution Newspaper.

"In their recent, perhaps most aggressive report presented to the Georgia Public Service Commission early this month, staffers blamed Georgia Power for failing to manage the project and its contractor in a reasonable manner. Staffers argued ratepayers should not be held responsible for additional costs resulting from Georgia Power’s mismanagement of the project."

Georgia has created a regulatory travesty for its people and small business owners. I wanted to take this opportunity to explain some of the history of the Vogtle Project along with its significant safety defects, and compare it to another historical financial and technological fiasco: the sinking of the Swedish warship Vasa. Although experts knew the Vasa was doomed, it set sail on its maiden voyage only to capsize within sight of the pier.  Read below to see how Georgia Power and its Vogtle reactors are now embarking on the same path.
This project – the last nuke standing in the nuclear industry claimed #nuclearrenaissance – was initially funded by federal subsidies (your and my taxes in case you did not know), ratepayer surcharges that are “prepayments” for the project – long before it ever, if ever, generates electricity, and Westinghouse payments that helped to drive that corporation into bankruptcy.

The Vogtle Project, located near Waynesboro, GA, was a financial fiasco from start to what should be its discontinuation. Both construction costs and construction time have doubled. As we relearn too often, history repeats itself. For me that repetitive history is taking place now with the Vogtle Plant.

Back in January 1625, Swedish King Gustav II Adolph commissioned the warship Vasa, which he hoped would become one of the greatest wooden sailing vessels ever built in the entire world. The original plans for the Vasa contained 32-guns, and then a second gun-deck was added above the first increasing the ship’s armament to 64-guns. To accommodate for these added guns, Swedish King Gustav and his sailing vessel craftsmen conceived a newfangled strategic innovation to build the Vasa sailing Gunship with two tiers of guns. The Vasa’s keel – the major beam that runs through the center of the boat and connects all its ribs – it is akin to a person’s backbone – was spliced and lengthened in order to accommodate the double-deck gun scheme after construction had already begun. Other hefty features were added, including beautiful ornate wooden carvings further increasing the Vasa’s topside weight and further delaying its construction. Stability concerns for the top-heavy Vasa were ignored as she set sail on her maiden voyage more than 3 ½ years after King Gustav first envisioned this allegedly superior warship. As crowds lined the pier and Sweden’s King looked on in pride, the top-heavy warship was buffeted by a gust of wind, capsized, and sank only a mile from the dock.

The Vogtle fiasco is no different than Sweden’s pursuit of the Vasa – its illusory world-renowned warship. Vogtle and the Vasa were both plagued by mismanagement, schedule slippages, engineering concerns, and crippling cost increases.  

The Vasa was recovered from its watery grave in 1960 and now is the centerpiece exhibit in a Swedish museum. While tourists marvel at its ornate carvings, graduate students in Master of Business Administration (MBA) Degree programs study the causes of this calamity, which worldwide has been named the Vasa Syndrome, a classic example of hubris and overreach in the midst of worldwide technological and strategic change.
Reba McEntire - The Night The Lights Went Out In Georgia
Reba McEntire - The Night The Lights Went Out In Georgia

Like the Swedish warship the Vasa, the purported nuclear power renaissance asserted by the heavily subsidized atomic power industry attempted to construct a new nuclear power armada of 31-proposed so-called “advanced” atomic reactors. This purported nuclear power renaissance has capsized at the pier without firing a shot of electricity to any community while ratcheting up billions of dollars in consumer costs and taxpayer subsidies all over the United States (U.S.). 

After significant financial losses to real people and local communities, while assuring years of profits for the atomic power vendors and nuclear plant owners and stockholders, fully 29 of the proposed 31 illusory new reactors have been either indefinitely postponed or totally cancelled after a great waste of money in what could have been a true investment in America’s energy infrastructure and renewable power sources. 

These days the only two remaining proposed reactors under construction are for Georgia’s Vogtle nuclear power plant site. The construction schedule for these reactors has more than doubled as their construction time approaches 10-years, and its anticipated construction costs are near $25 Billion, which is considerably more that the originally proposed $10 Billion price-tag. In a true capitalistic system, these nuclear power reactors would have been canceled some time ago, but the pronuclear good ole boy Georgia Public Service Commissioners have kept these two outmoded and unsafe AP1000 nuke reactors on forced consumer life support. Consumers in Georgia are already paying an extra $120 per year to finance this fiasco.

Let’s give one more final look at the Swedish warship the Vasa:
The sinking of the Vasa was a major disaster for Sweden. The country was at war with Poland and the ship was needed for the war effort. No expense had been spared. The Vasa was the most expensive project ever undertaken by Sweden and it was a total loss. The ship’s captain survived the sinking and was immediately thrown into jail. On August 11th, the day after the disaster, a preliminary board of inquiry was convened. Incompetence of the captain and crew was ruled out and the captain was set free. A formal hearing was conducted in September of 1628. No exact reason for the sinking was determined and no one was blamed.

It’s a financial horror that America had not learned the Vasa’s 300-year-old lesson! Well before the nuke power industry’s 31-fantasy nukes were even proposed, the worldwide electric energy market was in the midst of enormous technological change.

  • Renewable energy technology is easy to harness, energy storage is available, and consumer appliances like refrigerators, washers, and dryers are now more energy efficient.
  • Across the world, growth in sustainable and environmentally friendly energy technology has been stymied by spending on atomic power plant construction mismanagement, schedule delays, engineering problems, and crippling cost increases.
  • The gust of wind that finally capsized the mythical nuclear renaissancewas its top-heavy cost structure and absolute refusal to embrace new consumer and ratepayer friendly advances in generating electricity. 

A change in generating electricity from the 20th century business plan of major corporations owning giant CONG (Coal, Oil, Nuclear, and Gas) power plants that benefitted the corporate status quo to the renewable and sustainable customer friendly distributed power grid was long-foreseen by energy experts and energy investment financial advisors, but denied by electric and utility regulators whose investments and stock options kept them focused on personal enrichment.  Now, prevailing corporate utility and energy production owners continue to pilfer the pockets of unprotected consumers and small business owners for the astronomical costs of dozens of incomplete reactors. These potbellied corporate enterprises now claim that such exorbitant costs were “prudent” and an unforeseeable “perfect storm”. 

The truth of the matter is that the gust of wind that caused the self-proclaimed nuclear renaissance to capsize was just like the one that capsized the Vasa: the problems at Vogtle and the other defunct atomic power reactors are due to top-heavy structures created by management hubris and overreach to earn huge personal salaries (over $4.3 Million for Paul Bowers, the CEO of Georgia Power) with perks like private jets and country-club memberships, while you and I are challenged to pay our bills and support our families in this new more unfriendly to former middle-class American breadwinner.

Unlike the ornate Vasa museum piece, Vogtle’s management and its cohorts are truly hunks of concrete and rusting steel that beg the question: “When will they ever learn?”

Here are the taglines from Georgia Power’s About Us page: 
"Value. It's a promise."

-Tell that to Georgia’s ratepayers who will be billed for this ongoing waste of their money.
"Reliability. Flip the switch and the light turns on." 

-Tell that to the Atlanta Airport and all the holiday travelers who were stranded with no electricity for more than 10-hours. Is this the company you want operating an unsafe and untried design on a new atomic power reactor?

"Service. A little Southern hospitality from Georgia Power." 

-Not the kind of Southern Hospitality my family and friends down South deliver!

"Stewardship. Taking care of the state we call home."

-Home is where one’s heart is, not a cash-cow. Time for the people of Georgia to elect regulators that respect consumers’ needs to economically heat and electrify their homes.
Vogtle - End of the Nuclear Renaissance
In August, Arnie and Maggie were invited by the Blue Ridge Environmental Defense League (BREDL) to present this material showing the inherent risks of the AP1000 reactor to citizens’ groups gathered in Decatur, Georgia (GA) adjacent to the DeKalb County Courthouse and as an invited guest speaker at Paine College in Augusta, GA. For more information on the alarming list of issues surrounding the AP1000 reactor design, listen now! 
Big Bucks for Small Modular Reactors
Written by Ben Shulman-Reed
A new study from the Lazard financial firm shows that not only is it cheaper to operate renewables compared to coal and nuclear power, but it's actually cheaper to BUILD new renewable and sustainable energy options than continue to run outmoded dirty coal and atomic powered plants! This eye-opening study has been echoed by a United Kingdom (UK) National Audit Office (NAO) report and The UK Department of Energy & Climate Change, which found that per megawatt hour, the cost of onshore wind power and large-scale solar would be 60 percent LESS than electricity produced at the UK Hinkley’s Point Nuclear Power Plant.

With this new information, all of us would think that most energy producers would see through the smokescreen and choose cheaper and cleaner energy sources? In some cases, this is true, but pro-nuke industry groups keep clamoring for Small Modular Reactors (SMRs) that they claim are a more “affordable” nuclear power option. 

Safety, waste issues, and the huge cost of decommissioning aside, how do these SMRs compare to other renewable options? Another UK government study shows that in fact, power from small modular reactors (SMRs) would cost nearly 1/3 more than the current outmoded large nukes, which we already know is triple other sustainable and renewable energy sources!

In Fairewinds’ eyes these financial assessments and governmental reports give absolute proof does not put these nuclear that atomic SMRs are no competition for the successful and proven technologies of small modular RENEWABLES like solar and wind.

Once again, Fairewinds Energy Education asks energy producers, consumers, and practical thinkers around the globe to see through the Atomic Power Smokescreen and create smart energy investments today. 
Smokescreen
Stay tuned – we will keep you informed!

Thanks again and all the best from the Fairewinds Crew:

~Maggie, Arnie, Ben, Sue & Grayson

None of our work would be possible without the financial support of supporters like you!

Please help us continue our mission to speak truth to power and donate today to Fairewinds Energy Education! 


Fairewinds Energy Education
Burlington, VT
Facebook   Twitter
Having trouble reading this email or viewing the images? Please let us know! We just changed our Email Service Provider and want to ensure all our followers can still read our communications with ease.
Thanks!

Saturday, August 5, 2017

New U.S. reactor construction collapses because it's “prohibitively expensive”: the fight for justice continues | Beyond Nuclear


South Carolina electric utilities have scrapped finishing construction for two half-built Westinghouse reactors admitting that nuclear power is “prohibitively expensive.” The abandonment of the V.C. Summer Units 2 and 3 in Jenkinsville, SC comes with an estimated $11 billion in sunk costs and still projected six years from completion. The cancellation adds to the growing number of tombstones for once championed “milestones” in an atomic power revival. The inability to control the “cost-of-completion” and “time-to-completion” is the fundamental economic failure behind this recent collapse of the nuclear industry. In fact, these same reasons were featured in a 1985 Forbes magazine cover story “Nuclear Follies” describing the development of commercial atomic power as “the largest managerial disaster in U.S. business history where only the blind and the biased can say the money was well spent.”
There is not one nuclear power project in the United States that has ever been built on budget and on time, only more or less grossly out of proportion. The country is littered with the abandoned hulks of the 20th Century’s "nuclear error” including Seabrook Unit 2 in New Hampshire, Shoreham in New York, Midland in Michigan, the “Whoops” reactors in Washington, Bellefonte in Alabama, Marble Hill in Indiana and Zimmer in Ohio. These sites stand as monuments to nearly 100 more cancelled construction projects.   
The recent collapse of V.C. Summer 2 &3 now weighs heavier on the only remaining new reactor construction in the U.S. at Vogtle units 3 and 4 in Waynesboro, Georgia. With the bankruptcy of Westinghouse Electric and still mounting financial trouble for its Japan-based parent company Toshiba, Southern Company and Georgia Power were handed the dubious oversight and management of construction by the U.S. Department of Energy for the two Westinghouse reactors still being built there. The fate of the Vogtle boondoogle is still uncertain even with Toshiba giving $3.7 billion to Southern Company to contractually cut loose of the project and spread the cost out over more owners. Just how much and how long it will take to complete the untested design remain inescapable questions.  Southern Company's new projected cost-of-completion for Vogtle has balloned to $25 billion.  Southern is under pressure to tell the Georgia Public Service Commission by end of 2017 whether it plans to go forward with completion of the Vogtle expansion.  The decision could come as early as the end of August 2017.
The repeated and predictable economic failure of atomic power sends an ever direr warning of the shear folly in wasting billions more dollars and decades longer only to predictably fall short in the challenge to abate climate change. Again, nuclear power is exposed as an unreliable partner in any “energy mix” with renewable power from the wind and sun, energy efficiency and conservation. Nuclear power, new and old, only serves to divert and deplete necessary resources and squander the precious little time that remains.
The collapse of the nuclear industry further lay bare the economic and environmental justice struggles still ahead to hold corporations accountable to greed, fraud and desecration.
Accolades are much deserved to the environmental and consumer protection groups that have been involved from the beginning with the proposed Summer and Vogtle expansions. These same organizations are now demanding ratepayer restitution and protection from still more fleecing.
As Tom Clements, South Carolina’s advisor to Friends of the Earth (FoE) puts it, “The decision to abandon the V.C. Summer project is of monumental proportion and is a full admission that pursuit of the project was a fool’s mission right from the start.” According to Clements, the abandonment of construction now portends a fight for economic justice where, “Rather than applauding the decision this is a time for reflection and to prepare for formal proceedings before the PSC that will review how this debacle happened and how to refund ratepayers money due to a string of imprudent decisions.”
Sara Barczak with the Southern Alliance for Safe Energy (SACE) is wondering how much longer it will take Southern Company to pull the plug on Vogtle 3 and 4. Still she continues the call for “stopping the forced draining of customers’ wallets” there. Indeed, as Barazk observes for V.C. Summer, “A very costly door has closed on the so-called nuclear renaissance” and the awaited announced cancellation of Vogtle 3 and 4. 

Beyond Nuclear - Home - New U.S. reactor construction collapses because it's “prohibitively expensive”: the fight for justice continues


Tuesday, June 27, 2017

Stop the Nuclear Tax Bailout -- End the “Nuclear Renaissance” | NIRS


Stop the Nuclear Tax Bailout -- End the “Nuclear Renaissance”

The nuclear industry is trying to ram through another multi-billion-dollar bailout to keep the fantasy/nightmare of nuclear power alive. This time, through Congress. Stopping this bill (HR 1551) could end the so-called “Nuclear Renaissance” once and for all.
Utilities in Georgia and South Carolina are building four new reactors that are all billions of dollars over budget and years behind schedule. The problems were predicted before the utilities broke ground, but the extent of their failure is truly remarkable. The reactors are less than half-way built and have already bankrupted Westinghouse, the largest builder of reactors in the world – proving that nuclear power is a failed technology with no future.
HR 1551 would try to ensure these reactors get built by guaranteeing them $5.2 billion in federal tax breaks that are scheduled to expire in 2020. Because of the massive construction delays in building the reactors, none of them are expected to be online before then.
Please contact your Senators today and tell them to vote "NO" on HR 1551.

SIGN NOW

MORE BACKGROUND
Some or all of the four new reactors being built in the U.S. could be cancelled soon, despite billions of dollars in state and federal subsidies. The two reactors at Plant Vogtle in Georgia have already received $8.3 billion in taxpayer-guaranteed loans, and ratepayers in both states are paying steep rate hikes to cover the financing costs of the projects.
But one of the subsidies – the Nuclear Production Tax Credit – could expire before costing taxpayers a dime. Utilities can only take the tax credit for electricity the reactors actually generate, and it appears none of them will be completed before the program expires by law in 2020. If that happens, it willg taxpayers over $5 billion.

Georgia Power, SCANA, and Westinghouse are begging Congress to rush through a bill (HR 1551) that would NOT ONLY eliminate the 2020 expiration date, but give $2.6 billion in federal tax credits to tax-exempt state utilities and cooperatives that are 50% co-owners of the new reactors. 

The bill would allow the non-profit utilities to transfer the credits to the for-profit utilities and Westinghouse. 

The House of Representatives passed HR 1551 through last week, and Senate Majority Leader McConnell is pushing for a Senate vote this week, before the American public can find out about it. And President Trump has already said he will sign the bill. 

The whole scheme amounts to a $5 billion bailout to four dirty, dangerous reactors – using a new and still-unproven design – that have already had major construction and manufacturing problems.
For more information:

SIGN NOW :: Stop the Nuclear Tax Bailout -- End the “Nuclear Renaissance” | NIRS

Consumer Watchdog, Environmental Organizations Demand Congress Reject Nuclear Bailout


FOR IMMEDIATE RELEASE | JUNE 20,2017
Expert contact: Ben Schreiber, (202)-222-0752, bschreiber@foe.org Communications contact: Patrick Davis, (202) 222-0744, pdavis@foe.org

WASHINGTON, D.C. – Thirteen environmental and consumer watchdog organizations representing millions of members today sent a letter to the House of Representatives urging members to oppose bill H.R. 1551, which aims to bail out the nuclear industry after troubled investments in new reactor projects in the southern U.S.


Last week, H.R. 1551, a bill to amend the IRS code and modify tax credits to nuclear power facilities, passed the House Ways and Means Committee by voice vote. House leadership placed this controversial, fast-tracked legislation on the suspension calendar for this week and the bill is expected to be brought to the floor today.

The legislation comes as Southern Company and SCANA push to get the government, via U.S. taxpayers, to foot even more of the bill for the utilities’ failed bet on nuclear reactors. The projects have been beset by extreme cost overruns and completion schedules have doubled. Westinghouse’s decision to construct four new nuclear reactors for utilities in Georgia and South Carolina has not only bankrupted the company, but also placed its parent company, Toshiba, in an extremely precarious financial position. If enacted, this bill would grant an additional $2.6 billion to the failing projects by making tax-exempt co-owners eligible for federal tax credits, and permitting them to transfer the credits to for-profit corporations.

“These four reactors, two at Southern Company’s Plant Vogtle and two at SCANA’s V.C. Summer, have been under construction since 2009 and were supposed to be operational by now, but are nowhere near complete,” said Ben Schreiber with Friends of the Earth. “Both projects have already benefitted from state and federal incentives, yet their customers have suffered from rising electric bills. There is no reason to burden these customers further or make U.S. taxpayers shoulder any more of the costs for these failed experiments. Congress should ensure the utilities’ shareholders take on some of the risk, not assure yet another multi-billion dollar taxpayer-financed nuclear bailout.”

The letter explains that:
The failures to bring any of the four reactors online within the fifteen-year period of the tax credit program demonstrates that the technology is an even greater failure than the first generation of reactors, and it will never be widely commercialized. It is simply not a justified or worthy investment of taxpayers’ money to grant the owners of these reactors the extraordinary relief of billions of dollars in subsidies for projects that hold no promise for the U.S. energy sector. It should not be forgotten that Southern Company’s expansion of Plant Vogtle has already received substantial taxpayer support through the $8.3 billion in federal nuclear loan guarantees and the public/private cost-sharing support during the permitting and licensing process.

“We urge Congress to give the American people a break and stop throwing billions of dollars in wasteful and ineffective subsidies at these boondoggle nuclear projects," said Tim Judson, executive director of the Nuclear Information and Resource Service. "The industry promised that $20 billion in loans and payouts from taxpayers would revive nuclear power and lead to a 'Nuclear Renaissance.' But all that money and more has only managed to get four reactors less than half- built in ten years, and bankrupted their manufacturer with billions of dollars in cost overruns. Not passing this bill will save taxpayers at least $5 billion dollars. It's time for Congress to give the American people a break.”
Find the letter here.

###

Friends of the Earth fights to create a more healthy and just world. Our current campaigns focus on promoting clean energy and solutions to climate change, ensuring the food we eat and products we use are safe and sustainable, and protecting marine ecosystems and the people who live and work near them.
Founded in 1978, Nuclear Information and Resource Service (NIRS) is the information, networking and outreach center for organizations and individuals concerned about nuclear power, radioactive waste, radiation and sustainable energy issues. NIRS works to advance the transition to clean, efficient, renewable energy; advocates for responsible and environmentally just solutions to radioactive and toxic waste; and fights to protect the public from the effects of radioactive contamination. We provide policy expertise and informational resources on energy and radioactive waste, and monitor policy developments on the national and state levels.
Founded in 1985, the Southern Alliance for Clean Energy promotes responsible energy choices that work to address the impacts of Global Climate Change and ensure clean, safe, and healthy communities throughout the Southeast. Learn more at www.cleanenergy.org.



SEE ALSO: Stop the Nuclear Tax Bailout -- End the “Nuclear Renaissance” | NIRS